KitLog pro

Powered By Kitlog Pro v2.0

Sonex 1093 Construction Log
' style=
Date:  8-17-2007
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Power Tool Bench

Added supports for a bottom shelf; planed the top to tak out twist. Nailed 1/4" ply top over existing top.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.