Sonex 1093 Construction Log
' style=
Date:  11-21-2008
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Worked on Garage Shop

Prepping garage in hopes of working there during colder weather:

* Installed weather strip on garage door
* Installed pegboard on wall for tools
* Attempted to level 4 x 12 table, which changed when it was moved to new spot on floor