KitLog pro

Powered By Kitlog Pro v2.0

SAMUEL'S WEB SITE
' style=
Date:  8-20-2018
Number of Hours:  1.00
Manual Reference:  Hori. Stabalizer
Brief Description:  Drilled and clecoed rear ribs and front rib to spa

With the doublers in place, in accordance with my plans, I drilled and clecoed the rear ribs onto the spar, and then drilled and clecoed the front rib on the spar aswell.
' style=

I laid out and aligned the ribs onto the spar, and drilled and clecoed the rear ribs in place

I laid out and aligned the ribs onto the spar, and drilled and clecoed the rear ribs in place

' style=

With the rear ribs in place, I drilled and clecoed the front rib in place

With the rear ribs in place, I drilled and clecoed the front rib in place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.