Powered By Kitlog Pro v2.0
Dennis's Web Site
Savannah S
All
11-22-2013
< Previous Log Entry
Next Log Entry >
Date:
11-22-2013
Number of Hours:
5.00
Manual Reference:
ch 8
Brief Description:
Construction of stab
All surfaces that has contact with other surfaces was painted with anti-corrosion paint that came with the kit.
Main construction was assembled and riveted.
Skins were deburred and the lower skin was riveted, still need to leave the other one untill another EAA inspection.
Fitment of skins is perfect, it almost feel like cheating when im assembling this kit, im i building an aeroplane or lego?
Anti-corrosion paint on.
Very good method of riveting bad angles.
bottom skin riveted.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Savannah S Home
Category
# Logs
# Hours
All
198
892
Avionics
30
144
Driving the car
8
16
Empennage
19
52
Engine
33
164
Färg
1
10
Fuelsystem
9
21
Fuselage
46
181
Miscellaneous
23
173
Wings
29
131
Copyright © 2001-2024 Matronics. All Rights Reserved.