KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 Project
' style=
Date:  5-1-2013
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Bolted and wheels installed

Bob and I bolted the gear on and torqued them down then installed the wheels. The fuse was up on a couple of steel saw horses while doing this and JUST as the last wheel was slid in place the fuselage settled onto the wheels. I looked over, wondering why he had lowered it and he was looking at me with the same disbelief....the saw horse folded! If it had done so 5 seconds earlier the plane would have been sitting on it's brake caliper....I got lucky.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.