KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 Project
' style=
Date:  11-1-2012
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Painted assembled and started wiring switch consol

The remaining switches from Aircraft Spruce has STILL not arrived. It's been 6 weeks and it's getting irritating I decided to go ahead and start wiring, since it requires an obscene amount of jumpers to make the lights light up pretty like I want. Best to get some of it out of the way.

I wanted the blue LED to remain lit all the time while the red comes on only when the switch is illuminated. It's not a difficult thing figuring out which pins to jump in order to make that happen, but it really is quite a few jumpers to make. In the end though, I love the look. I've tested the under the rail blue led strips already too and those look amazing. No pics of those until I get them installed though.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.