KitLog pro

Powered By Kitlog Pro v2.0

Sid & Houston Mayeux Project
' style=
Date:  11-7-2010
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Positioning & match-drilling the elevator hinge br

To match-drill the elevator hinge brackets with the rear spars and spar channels, I found I needed to pre-drill the bracket's holes with the #30 drill before I could cleco them to the spar/channel assembly. The existing bracket holes were too small--if I used the #40 cleco it just fell out of the #30 holes already in the spar/channel assembly. Once I opened up those bracket holes, everything stayed clamped together with the larger clecos.
' style=

Cleco the brackets into the right holes

Cleco the brackets into the right holes

' style=




' style=

Match-drilling brackets, spars, channels

Match-drilling brackets, spars, channels

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.