KitLog pro

Powered By Kitlog Pro v2.0

BRIAN'S WEB SITE
< Previous Log Entry          Next Log Entry >
' style=
Date:  9-27-2022
Number of Hours:  2.00
Manual Reference:  Section 6
Brief Description:  Vertical Stabilizer Skin Fitment to the Skeleton

Clecoed on the VS-801PP Vertical Stabilizer Skin. After that was in place took care of match drilling all the holes to #40 as per the plans. The next operation will have us dissasembling the whole structure and preparing the parts for prime and final riveting/assembly. There is alot to do with countersinking (some holes), dimpling operations and lots of deburring holes and edges. I have my work cut out for me for sure.
' style=





' style=




' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.