Brief Description: Fittting and Drilling the Vertical Stabilizer
Began construction of the Vertical Stabilizer today. Started by clecoing the VS-808PP Spar Doubler to the VS-803PP Rear Spar Channel. Fits nicely!! Next I clecoed on the 3 Hinge Brackets VS-410PP, VS-411PP and VS-412PP.
After having everything clecoed tight I turned my attention to the bottom hinge bracket VS-410PP and back drilled through the VS-803PP spar channel, the two holes that were missing from the pattern on the VS-410PP Upper Hinge Bracket ONLY! I left the lower holes on the bracke alone as this will be drilled later when fitting to the fuselage which is a LONG TIME AWAY!