Powered By Kitlog Pro v2.0
BRIAN'S WEB SITE
RV-7
All
3-3-2022
< Previous Log Entry
Next Log Entry >
Date:
3-3-2022
Number of Hours:
0.50
Manual Reference:
Section 6
Brief Description:
HS-411PP, HS-411BP & VA-146 bearing assembly
Clamped HS-411PP and HS-411BP with VA-146 sandwiched between. Attached entire assembly to Rear Horizontal Spar Assembly for match drilling. Match drilled 4 aft holes on bearing assembly as it was attached to the spar (as per plans)
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
88
101
Empennage
79
76
Miscellaneous
6
22
Shop Supplies
2
1
Tools
1
2
Copyright © 2001-2024 Matronics. All Rights Reserved.