Powered By Kitlog Pro v2.0
Scott's Osprey
GP-4
Empennage
8-14-2016
< Previous Log Entry
Next Log Entry >
Date:
8-14-2016
Number of Hours:
10.00
Manual Reference:
Plan #11
Brief Description:
horizontal stabilizerv ribs and spar
Capped top, bottom, and back of ribs with 1/4"x3/8" spruce. Drew the spar out on the table and cut spruce to fit the drawing as per plans.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
GP-4 Home
Category
# Logs
# Hours
All
16
114
Empennage
15
87
Miscellaneous
1
27
Osprey 2 Home
Copyright © 2001-2024 Matronics. All Rights Reserved.