Apply thread sealant and tighten all NPT oil hose fittings. Remove stock oil sump plate & 5 of the 6 studs for same. Install ACV-P02-20 Oil Sump Plate, which has a port for the oil separator return line. Use one acorn nut and 6mm x 16mm cap head screws x 5 & 6 copper washers to install plate.
Oil Cooler & Oil Temperature Controlller Hoses Installed #4842