KitLog pro

Powered By Kitlog Pro v2.0

MARK'S WEB SITE
' style=
Date:  3-7-2004
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Engine Work

Moved alternator to align better with the flywheel. Installed the dipstick tube. Installed the exhuast. Installed and connected the EGT probes. Created a permant ground connection to the airframe and the engine case.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.