Added weight to the left elevator using epoxy and lead shot. Mounted the horizontal stab back onto the bench to verify weight added to left elevator was correct. Left side balanced. Drilled the lead in the right elevator to balance it. Right side balanced. Also verified the travel (up and down) of the elevators meets the plans.