KitLog pro

Powered By Kitlog Pro v2.0

RUSS'S WEB SITE
' style=
Date:  3-10-2009
Number of Hours:  4.20
Manual Reference:  75F Series
Brief Description:  Applied ZnO to RHS, cleco'd and riveted it.

Of the hours here, 1.2 were Caroles.

Sprayed the yellow zinc oxide corrosion control to all mating surfaces of the RHS, then clico'd it all back together (stiffners). Then riveted it all up and set it aside.

Figure 1 shows it set aside. Figure 2 shows the blank LHS ready for start.
' style=

The RHS set aside for later

The RHS set aside for later

' style=

LHS ready for start.

LHS ready for start.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.