KitLog pro

Powered By Kitlog Pro v2.0

RUSS'S WEB SITE
' style=
Date:  3-1-2009
Number of Hours:  4.90
Manual Reference:  75F Series
Brief Description:  Fabricated diagonal L sections for RHS, drilled, c

Of these hours 2.1 of them were by Carole.

Fabricated the L sections which crisscross the side of the fuselage. Then clamped them on, drilled from the tiny holes on the skin, and cleco'd them in place. About half done with this.

I have spent a lot of time trying to anticipate the connection of the rear fuselage piece to the front piece so as to prepare the side panel optimally.
' style=

The RHS with clecos in place

The RHS with clecos in place

' style=

The planning room with bandsaw

The planning room with bandsaw

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.