Brief Description: Picked out all fuselage parts. Studied plan.
Of these hours, 2.1 were Caroles.
Spent the morning with Carole's help sorting out the fuselage parts from all the other parts, in preparation to starting the fuselage. (Set aside the flaperon parts since the flaperon skin is on backorder.) Looked for parts missing from inventory and found one of them. The fuselage parts are big and bulky and flexible until it begins to take on its 3D shape.
Laid out the right side skin and located the other parts which connect to it. See figure 1. Many of the other parts were put back in the crate for safekeeping. See Figure 2.
Studied the Zenith Air builder's website for possible assistance or tips.