date RR CJR 10/3 4.4 Flaperon supports 10/4 4.0 3.2 Wing Strut Attachments 10/5 2.3 2.0 " 10/6 3.1 1.8 Back Windows 10/7 2.8 1.4 10/9 9.0 Seats and seat belts 10/10 1.0 Seats, cabin trim _____________________ 26.6 8.4
A little behind in writing reports but progress has been made. We installed the flaperfon supports to the R wing and temporarily put on the flaperons. This is for the purpose of aligning the tabs which hold the IB and OB sections together. The OB tab is on. The IB tab is positioned to give a 15 degree down flap position to the IB section.
All the wing strut fittings are now attached to the R hand wing as is the inspection plate near the gas tank.
All the back windows have been fitted and pilot holes drilled. This posed no problems. We used the DeWalt drill for this to get a slower speed through the plexiglas.
All the cabin trim items have been located and duct tape into position. Some pilot holes have been now drilled. The L hand seat pan was removed and the positons for the nutplates located and pilot holes drilled. The left hand seat belt attachments are in place with clicos. The location of the shoulder harness attachment is not given. I have called about that.
I have asked for a quote for a Jabiru 3300 engine and firewall forward kit and for an avionics kit like the one in the demo plane.