Powered By Kitlog Pro v2.0
Chucks Web Site
T-51D Mustang
Fuselage
5-19-2019
< Previous Log Entry
Next Log Entry >
Date:
5-19-2019
Number of Hours:
3.00
Manual Reference:
Brief Description:
Hydraulic Gauge, Emergency Dump and Fuel Cutoff Va
Installed and connected the emergency dump valve and pressure gauge for the hydraulic system. Also installed the main and auxilliary gas tank valves.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
T-51D Mustang Home
Category
# Logs
# Hours
All
127
766
Avionics
2
36
Engine
3
9
Fuselage
114
660
Miscellaneous
2
15
None
2
25
Prop
1
8
Wings
3
13
Copyright © 2001-2024 Matronics. All Rights Reserved.