KitLog pro

Powered By Kitlog Pro v2.0

RON'S WEB SITE
' style=
Date:  3-4-2009
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Replaced four contersink bolts in gear weldments..

...Replaced AN509R12 bolts in each forward leg of landing gear weldment. Paul drilled out the heads of the old bolts to use a tapered washers inside cockpit.
' style=

Installed backwards

Installed backwards

' style=

Proper way

Proper way

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.