KitLog pro

Powered By Kitlog Pro v2.0

RON'S WEB SITE
' style=
Date:  4-8-2009
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Completed wires to A/P roll & pitch channels...

...Secured A/P pitch & roll channel wires along their paths with adel clamps & ties. Put wires into D-subs and secured plastic covers and installed on units. Secured the wire loops with nylon ties. Crimped male dsub connectors on mangatometer input/output wires, inserted into dsub and placed plastic guard over dsub and connected to unit. Secured excell wire loop to nutplate and secured middle with nylon tie.
' style=

Magnetometer

Magnetometer

' style=

A/P roll channel

A/P roll channel

' style=

A/P pitch channel

A/P pitch channel

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.