Brief Description: More wiring on stick trim, panel lights...
...Used left over RV-6A cutouts on both steps for grip area. Glove box GRD labeled and new lug added and secured to firewall Grd. Trim UP/DOWN labeled and eye added and attached so that stick trim operates. Began fabricating an attachment for more wire connections for control stick wires. Reinstalled panel. Light power wire labeled and ran for the switch. Light fuse power wire labeled and ready to run to fuse panel. Main Bus tray reinstalled. Place panel back in.