KitLog pro

Powered By Kitlog Pro v2.0

RON'S WEB SITE
' style=
Date:  12-16-2003
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Drilled L/R elevators for installation...

...Drilled L/R elevators for installation...Drilled each elevator horn for assembly and installed giving 22 degrees upward travel (need 25-30) and 19 degrees downward travel (need 20-25) so elevator stop needs to be trimmed.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.