KitLog pro

Powered By Kitlog Pro v2.0

RON'S WEB SITE
' style=
Date:  3-23-2001
Number of Hours:  9.00
Manual Reference:  
Brief Description:  Interior floor work, electric flaps...

...Interior floor work, electric flaps...Installed nutplates on EF-601/602 channels, trimmed and finished trim panels, cut around flap torque tube, drilled bolt holes thru F680 bearing block, installed nut plates for F680 bolts, trimmed removeable center plates around F680 bearing blocks, drilled bolt holes in both F661EF bearing blocks. Primed trim panels, trimmed side wall panels to accomodate flap rods.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.