|
|
|
|
Bobs Ten
|
Date: 1-12-2014
|
Number of Hours: 2.20
|
Manual Reference:
|
Brief Description: Install Left ER Tank
|
|
1224 - 1436
Locate and clamp tank end mount brackets on 4" test pipe with breeze clamp, in X pattern.
Hot glue 1/2" spacers to test pipe to aid in centering brackets in lightening hole.
Position bracket assembly in lightening hole.
Match drill bracket mount holes using #30 drill, cleco as drilled, 8x.
Final drill mount holes using #12 drill.
Debur all holes.
Install bracket assembly with AN3 hardware, torque all hardware to 23 in/lb, 8x.
Remove breeze clamp and test pipe.
Install ER tank in wing.
Position tank per plans, top aft corner 9/16" from skin, centered fore and aft in lightening hole, and 1/8" from bottom of lightening hole. Clamp tank with C clamps.
Verify wingtip fit.
Outline tank on rib.
Locate and drill mount pilot holes in forward bottom and mid bottom tank flanges using #40 drill, cleco as drilled.
Remove clecos and tank.
Locate specified skin rivets for tank mount, remove these rivets, 8x.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |