KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten
' style=
Date:  5-13-2020
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Install Baggage Bulkhead Access Panel

1830 - 2130

The Skybolt fasteners were received today.

Using standard techniques, the Skybolt fasteners were located and mounting rivet holes were drilled. The fastener holes were then enlarged for the studs.

All pieces were disassembled, deburred and smoothed.

All required machine countersinks and dimples were completed.

The doubler pieces were then clecoed together.

The Skbolt receptacles were clecoed in position.

The receptacles were then riveted in place, followed by all other rivets. I wanted the doubler angles to overlap so there were 3 different length rivets used.

Tomorrow, I will complete the panel cover.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.