KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten
' style=
Date:  5-27-2013
Number of Hours:  2.50
Manual Reference:  34-6.5>7, 34-7.1>5
Brief Description:  Install Baggage Door

1324 - 1400 1500 - 1654

Remove hinge pin and door.

Note: Modified skin slightly to facilitate pin removal and insertion. I plan on replacing the pin with a Stainless .090 pin. Bend top of pin to allow gripping the pin.

Rivet hinge frame to skin, structure, using 3x gun, p-rivet puller.

Install door on hinge, insert pin.

Install SS striker plate using AN525-10R7 screws.

Cleco left baggage cover to structure.

Match drill the top 4 holes to bulkhead flange using #30 drill.

Final drill all common holes using #30 drill, cleco as drilled.

Match drill bottom flange holes in the baggage floor using #30 drill.

As before, the nut plates were already installed in the QB kit. I decided to drill out the rivets and proceed with the plans as indicated.

Final drill the nut plate mount holes using #40 drill.

Remove cover panel.

Debur all holes.

Dimple #40 holes for flush rivets.

Install insulation on skin behind cover panel.

Cleco cover in position.

Rivet cover to hinge frame using p-rivet puller and blind rivets.

Rivet bottom flange to floor using p-rivet puller and blind rivets.

Rivet cover top 4 holes using p-squeezer.

Rivet nut plates in position using p-squeezer.

SECTION COMPLETE excepta door lock and weather seal around door.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.