KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten
' style=
Date:  9-15-2014
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Install NACA Vents

1130 - 1300

Prep front and rear NACA vents, front and rear cable fairings for bonding and riveting.

Proseal was mixed and applied to the flanges of the SV-1 and SV-10.

Vents were clecoed, every hole, to the skin.

Proseal applied to cable fairing flanges.

Cable fairings were clecoed, every hole, to the tunnel wall and aft fuselage skin.

When proseal is dry, vents and fairings will be riveted in place.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.