KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten
' style=
Date:  3-23-2013
Number of Hours:  2.50
Manual Reference:  29-15>22
Brief Description:  Inspect and Complete QB Fuselage Section 29

1400 - 1630

Inspect, verify and complete Section 29.

Debur and smooth baggage door opening using vixen file, dremel tool, and s/b wheels.

Measure 3/8" down from F-1046 flange and mark a line on baggage door seal angle.

Trim seal angle using dremel cutoff wheel and pneumatic body saw. This would have been much easier to do per the plans BEFORE being riveted to the F1013.

Did not finish assemble side vents at this point. Still debating on whether to use them or just secure them closed.

Section 29 Complete.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.