Power pot section on panel and verify operation of heat and vent valves.
Ops checks good.
Install Deutsch connector on overhead switch wiring.
Install Deutsch connector on panel switch wiring.
Connect wiring to appropriate panel switches.
These connectors will allow removal of the entire panel for repair, diagnostics, and upgrades. Three differenct connectors were used to prevent improper connections. Two spare wires were also included in the connectors.