KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten
' style=
Date:  8-8-2019
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Install Overhead Switch Panel Wiring

1600 - 1830

Today I finished the switch panel pot installation.

Finish cut an sand PCB.

Trim pot actuator shafts to correct length.

Install pots in PCB and solder.

Verify wiring using DMM.

Install wires to PCB breakout points and solder.

Install 6 pin Deutsch connector with appropriate wires, conforming to previously created pin diagram.

Note that only 5 wires were used and a spare (white/green) was installed for future use.

Install aluminum knobs on pot shafts and tighten.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.