Remove dust from inside of overhead console using blow gun and vacuum.
Install overhead lighting.
Route power and ground wires from fuse block to fan PWM controller.
Install tie wrap mounts, secure antenna, power, and ground wires usingtie wraps.
Cut wiring to length and install fan PWM controller. Red = 12V, Blue = Ground, White/Orange = Fan +, White/Blue = Fan -.
I had planned on installing the eyeball vents but the retaining nut will clamp a minimum of 1/16". The CF overhead is less than this, so a spacer will be required. 1 15/16" #135 O-rings were ordered and will be installed as soon a they arrive.