I used several diameters of heat insulating sleeve to cover the injector wiring, and create the loom. Each injector was split from the main harness and cover with it's own sleeve. The Bosch receptacles were the installed, crimped, and soldered. Once the injectors were connected, the loom was secured usinf SVR tape.
The even side was then started by determining the routing for the injector wires. Once this was determined, the previous tie wraps holding existing wiring were removed and replaced, including the injector wire bundle.
The six wires were covered with heat insulating sleeve and the tie wraps were secured. This yielded a correct length to start the loom process for the even side.