KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten
' style=
Date:  9-11-2012
Number of Hours:  0.70
Manual Reference:  10-9.1.2
Brief Description:  Cleco Tailcone Forward Bulkhead, Baggage Channel

1436 - 1518

Cleco the F-1006 bulkhead to side and bottom skins and bellcrank ribs.

Final drill common holes between bulkhead and bellcrank ribs with #30 drill.

Debur and smooth all edges of the baggage bulkhead channel with bench sander and s/b wheel.

Cleco channel to top of F-1006 and bottom of channel to bellcrank rib.

Final drill top holes only with #30 drill.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.