KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten
' style=
Date:  8-21-2017
Number of Hours:  1.60
Manual Reference:  47
Brief Description:  Install Cowling

1424 - 1600

Remove clecos from forward and aft fairings.

Using RO sander, shooth all edges and remove excess epoxy.

Trim excess glass cloth and sand edges to final dimensions.

Smooth all edges using 180 S/P.

Verify fit.

Trim gear leg fairing opening in forward and aft fairings to allow for gear leg movement. Bryan at Showplanes recommended 5/8 - 3/4" on front edge, 1/4" on sides, and 1/2" on the aft edge with no load on nose gear. Thes measurements were marked using a homemade roller scribe.

Remove fairings.

Trim as required to new clearance lines.

Smooth all edges.

There were two minor areas that needed to be filled with epoxy so those areas were prepped and the mating piece was taped.

Cleco forward and aft fairings together.

Apply epoxy, remove excess.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.