Remove left panel insert enough to tighten the individual switches in the panel.
Install left panel insert using 6-32 torx screws.
Remove master caution and warning discrete lights. This was necessary to add length to the wiring which provided a more optimal routing. The wiring was extended using standard techniques and a soldered parallel twist splice.
Reinstall master caution and warning lights.
Begin final assembly of the right insert and related wiring. I may need to modify the 8" GDL51R extension to be shorter but I need to talk to Steinair first.