KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten
' style=
Date:  12-6-2019
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Install Instrument Panel

1500 - 1900

Continue routing harness.

The electric rudder trim support was a bit problematic when routing the main harness trunk. I made several minor changes to the way the support was attached and added an Adel clamp to support the harness trunk.

Routing was completed for the J1, J2, and J8 connectors to the VPX. The location of the VPX required splitting the harness in a different location, so the lacing was cut, the wires rerouted and tie wrapped.

I decided previously to supply power for the power ports from the aux fuse block. These wires were located within the harness and rerouted to the aux fuse block. No wiring was changed with the exception of removing the pin from the J8 connector and moving it to the fuse block supply.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.