KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten
' style=
Date:  11-4-2018
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Install Garmin GEA 24 Harness

1700 - 1830

Today I finalized routing of the cHT/EGT wires. I needed to move one Adel clamp due to inteference and chafing.

Once the routing was finalized, I wrapped the wire bundle in pyro wrap, pyro tape, and finalized the firewall pass through per the instructions.

The routing was verified.

Next I created heat shrink tubing labels for each wire and installed them on the corresponding wires.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.