KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten
' style=
Date:  12-6-2015
Number of Hours:  2.40
Manual Reference:  
Brief Description:  Prepare Door Channel for Seal

1224 - 1448

Continue preparing right door channel for Mcmaster seal.

Procedure was described for left door.

The cabin top had to be filed and sanded on the right to provide clearance for the seal.

Packing tape, weatherstripping, and additional tape was applied.

Epoxy, Flox, Cabo mix was applied to the channel and the door clampeed closed.

Excess epoxy was removed.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.