KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten
' style=
Date:  12-2-2015
Number of Hours:  1.60
Manual Reference:  
Brief Description:  Prepare Door Channel

1724 - 1900

Prepare right side door channel as described for leftr side.

Mix and apply epoxy, flox, cabo to channel.

Close door and remove excess epoxy.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.