KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten
' style=
Date:  11-20-2017
Number of Hours:  2.60
Manual Reference:  FF-2
Brief Description:  Engine Baffling

1300 - 1536

Sand and smooth inlet extensions and ramp joint.

Apply finish coat of epoxy/flox.

Fabricate baffle joining clips. I had previously fabricated the clips per vans plans but decided to go another route. I fabricated the clips such that they could be attached using #6 flush screws. This will make removing the baffles substantially easier should the need arise. I also decided to add stiffening flanges on the two larger clips.

This fabrication was completed using standard techniques.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.