Date:  6-27-2020
Number of Hours:  8.50
Manual Reference:  
Brief Description:  Install Wings

Moved required aircraft parts to hangar in multiple trips.

Installed the wings today.

Per a conversation with Vans, the close tolerance NAS bolts were placed on dry ice for 24 hours.

The left wing was slid into position and pinned with 2 temporary bolts.

The large wing bolts were removed from the dry ice and installed using a rubber mallet. The smaller bolts were then installed. The bolts were left for 24 hours to normalize the temperature.

This process was repeated with the right wing.