Moved required aircraft parts to hangar in multiple trips.
Installed the wings today.
Per a conversation with Vans, the close tolerance NAS bolts were placed on dry ice for 24 hours.
The left wing was slid into position and pinned with 2 temporary bolts.
The large wing bolts were removed from the dry ice and installed using a rubber mallet. The smaller bolts were then installed. The bolts were left for 24 hours to normalize the temperature.