Date:  6-26-2020
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Move Project to Hangar!

Moving Day!

The aircraft was pulled out of the workshop and loaded on a 102" x 22' deck over trailer.

It took the whole family to put it safely on the trailer.

Thank you to:

Jill

Katelyn

Kyle

Derek

Dad

Mom

Ted Womble

3/8" bolts were installed through the stub spar. Tie down straps were attached to these bolts. A winch was mounted on the front of the trailer to pull the aircraft. Additional tie straps were used as a safety strap, and they were tightened as the aircraft move onto the trailer. Once the aircraft was fully on the trailer, it was tie down and the tires were blocked.

We then drove it to the airport aproximately 12 miles from the workshop.

Definitely a stressfull day!