KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten
' style=
Date:  5-3-2020
Number of Hours:  3.20
Manual Reference:  
Brief Description:  Install Instrument Panel

1530 - 1842

This session was used to connect the final wiring.

I routed the RG400 to the tail mounted VOR/ILS/GS antenna. I opted to use a fiberglass sleeve to protect the cable. The end were terminated using BNC connectors, standard techniques. The sleeve was terminated with heatshrink using standard techniques. I decided to cut the wire at the fuselage bulkhead and will install a BNC bulkhead connector. This will allow for ease in removing and attaching the vertical stab.

I then installed the Com antennas temporarily and connected the BNC connectors. I want to make sure that the radios have antennas attached at first power up.

The flood light dimmer wire was not connected because I have not installed the LED light strip yet. I decided to terminate the bare wires with a Deutsch connector. This will make the connection of the LED lights easy, at a later time.

I then temporarily installed the center console, connecting the rudder trim, seat heaters, USB power, and headset connectors.

Finally, I temporarily installed the GDU's in the panel, after connecting the appropriate wiring and antennas.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.