KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten
' style=
Date:  5-2-2020
Number of Hours:  1.30
Manual Reference:  
Brief Description:  Install Instrument Panel

1800 - 1918

I started installing the avionics in their racks.

First I installed the GMU22 in it's mounts with the enclosed brass screws. Connected the CPC connector and secuered the connector with tiw wraps.

Next, I installed the audio panel, IFR navigator, and A/P head in their respective racks.

I decided to fabricate the two remaining battery cables using standard techniques.

The battery cables were then attached to appropriate terminals on the contactors. All nuts were tightened on the contactors.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.