KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten
' style=
Date:  3-21-2020
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Install Instrument Panel

1730 - 1930

Today I finished the seat heater wiring harness.

All Deutsch connectors were installed using standard techniques.

The harness was then powered and checked with a meter for proper operation.

Next, I finished the USB power wiring in the tunnel console, using .25" faston connectors and a 4 pin DT Deutsch connector.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.