KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten
' style=
Date:  1-10-2020
Number of Hours:  1.40
Manual Reference:  
Brief Description:  Install Instrument Panel

1530 - 1654

I installed the CF panel previously, using clecos.

Remove the g5 from the center insert.

Install push to connect fittings in the G5 and alternate static source switch.

Install center insert to voerify fit. As expected, the opening in the subpanel needed to be modified slightly. If the wire harness for the center stack did not run up the left side, the hole would have been near perfect. As it turns out, a substantial wire bundle runs up the left side and the is not adequate clearance on the edge of the opening.

Remove center insert.

Enlarge opening by 1/4" using standard techniques.

Slit a piece of 1/4" 5052 tube to use as an edge protector. Debur tube.

Fill tube with E6000 adhesive, install on opening edge.

Install GTX45R into rack.

Install throttle quad console to verify fit.

A clearance hole was required for the oil cooler valve wiring.

Remove throttle quad console, drill hole using unibit. Debur hole.

Install throttle quad console using clecos.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.