Bobs Ten
' style=
Date:  1-1-2020
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Install Instrument Panel

1306 - 1436 1530 - 1730

Finalize harness trunks and branches, tie wrap in final positions.

Due to the size of some of the branches and proximity to edges and moving parts, I decided to fabricate several angle brackets to facilitate securing the wire branches with Adel clamps. Two angles were fabricated from 063 angle using standard techniques. These angle were then secured to rack shelves in the appropriate locations. Standoffs were used to place the Adel clamps in the desired spatial plane.

All wiring branches were then tie wrapped as necessary. Redundant tie wrap were removed.

As each branch location was finalized, it was apparent that routing of several LRU branches could be improved. This did not require any wiring changes; only routing was changed. The connectors were then secured to each LRU.

The pitch harness was also rerouted to optimized the wiring run.

I then decided to shorten the previous wiring for the CO detector. As this unit uses header clamps, the wires were removed, shortened, and reinstalled. The CO detector was then reinstalled in its appropriate location..