KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten
' style=
Date:  12-27-2019
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Install Instrument Panel

1612 - 1742

Continue wiring.

The master caution and master warning light wires were a bit short for the desired routing. This necessitated extending the wires. Standard techniques were used.

Next, I installed an 8 pin Deutsch connector for the overhead switch control wiring. Standard techniques were used. The mating connector was then installed on the VPX wiring harness. The wiring was verified with switch position using a DMM proir to assembly.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.