KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten
< Previous Log Entry          Next Log Entry >
' style=
Date:  12-7-2019
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Install Instrument Panel

1500 - 1700

Continue wiring.

Route pitch trim position wires.

Route roll trim position wires.

Route flap position wires.

The harness trunk was modified as necessary to accomodate position of VPX and other components.

All harnesses were then tie wrapped to facilitate a neat installation.

Route GDL51R harness.

Route IBBS harness.

Route ELT harness to remote switch.
' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.